Skip to product information
1 of 1

LONG

LONG Lead-Carbon Battery 200Ah 12V

LONG Lead-Carbon Battery 200Ah 12V

SKU:

Regular price $248.00
Regular price $310.00 Sale price $248.00
Sale Sold out
Shipping calculated at checkout.
Quantity
  • Cash on deliveryPay when it arrives
  • Delivery across Lebanon2–4 business days
  • 5-day returnsUnused, in original packaging
  • Trusted since 1984Azar Group S.A.L., Zahle

LONG CWP200-12N Lead-Carbon Battery 200Ah 12V by Kung Long (LONG). CWP series VRLA battery with a special lead-carbon formula, made for long-life solar and wind energy storage.

  • 12 V, 200 Ah (10-hour rate), 170 Ah at the 5-hour rate
  • Lead-carbon VRLA design for cycle use in solar and wind systems
  • Cycle charging 14.4 to 15.0 V, float charging 13.5 to 13.8 V, maximum charge current 60 A
  • Maximum discharge current 1200 A for 5 seconds, internal resistance about 3 mohm
  • ABS case (UL94 HB, UL94 V-0 optional), F18 (M8 bolt) terminals

Specifications

Model CWP200-12N
Nominal voltage 12 V
Capacity (10 h, 20 A to 10.80 V) 200 Ah
Capacity (5 h, 34 A to 10.20 V) 170 Ah
Capacity (1 h, 120 A to 9.60 V) 120 Ah
Dimensions (L x W x H) 522 x 238 x 219 mm (224 mm overall height)
Weight approx. 68 kg
Internal resistance (1 kHz) approx. 3 mohm
Terminal F18 (M8 bolt)
Charge temperature -15 to 40 C
Discharge temperature -15 to 50 C

Download Datasheet (PDF)

View full details

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)